RE: Skygate C-ARF L39 build thread and virtual manual
Small update.
The gear, tank and tail pipe arrived.
Again the design of the model is geared towards express install.
Some work is still needed to complete the gear setup, then onto Turbine, tank, radio equipment and canopy.
Scale cockpit back ordered for now
Today (Oct 25, 2012) the system has blessed me in allowing me to upload.