RCU Forums - View Single Post - Candy Kane Build Thread
View Single Post
Old 07-16-2013, 05:55 PM
  #16  
sahartman21
 
Join Date: Nov 2007
Location: Fritch, TX
Posts: 2,060
Likes: 0
Received 0 Likes on 0 Posts
Default RE: Candy Kane Build Thread

The wing is then placed between layers of peel ply and placed in the vacuum bag.

After most of the air is removed, the vacuum bag was placed between the wing shucks.

Weights were applied on top to hold parts in place.

The vacuum was then turned on and parts were then allowed to dry. The pump pulls about 6" of Hg vacuum.
Attached Thumbnails Click image for larger version

Name:	Db85042.jpg
Views:	348
Size:	86.2 KB
ID:	1901337   Click image for larger version

Name:	Bx73772.jpg
Views:	334
Size:	93.1 KB
ID:	1901338   Click image for larger version

Name:	Jo29556.jpg
Views:	351
Size:	85.0 KB
ID:	1901339   Click image for larger version

Name:	By76622.jpg
Views:	346
Size:	99.5 KB
ID:	1901340