RCU Forums - View Single Post - G26 Stand offs
Thread: G26 Stand offs
View Single Post
Old 10-06-2013, 03:28 PM
  #4  
JohnBuckner
My Feedback: (1)
 
JohnBuckner's Avatar
 
Join Date: Dec 2001
Location: Kingman, AZ
Posts: 10,441
Likes: 0
Received 10 Likes on 10 Posts
Default

Actually moving the pack all the way forward ahead of the firewall will likely completely eliminate the need for the lead . Here are some I have done, It does require some fabrication of 1/8 ply carrier brackets which are secured to the firewall and not the engine mounts:





These are two different ones a Hellcat and a Corsair that are my carrier arrested landing ships.