Well the fuse planking in finally complete. Thank God.
Unfortunately, there are still 2 huge nacelles to plank.
At this point all the control rods and servos for the elevator and rudder are in, ya just can see them in the picts.
There are 2 hatches under the H-stab, one on each side, to access the far ends of the control rods. And the rear gunner's canopy is a hatch for access to servos, air tanks, etc.