Fuse (cont)
Planking (cont)
Another full sheet for the bottom area.
One of the ribs was used to outline the waste area on the fuse.
Last narrow strip for the front.
Belly pan outline cut into the sheeting.
Started on the last back bottom of the fuse still needing to be planked.
Wings (cont)
One rib needs to be cut extremely narrow for the wheel well as well as the partial cuts for the flaps. Using lite ply on that rib would have a breakage if you blew on it!
Ribs done to W-7 and dry fitted.
Initially, using a 1/4" riser when gluing the ribs to the bottom spar so the wing sits flush against the spar.
Later, will install the 1/2" riser for the washout.