First wing is about half done.
I've been able to get the wing tip formation light installed, the aileron has been hinged and the servo and linkage has been done, and lastly i have been able to hinge the flap and get the servo and it's linkage done and operating.
Next will be the doors and the gear install with the airlines hooked up and the gear bolted in.