RCU Forums - View Single Post - 1/6 F-105 Build Thread
View Single Post
Old 09-03-2018, 06:31 PM
  #22  
Viper1GJ
My Feedback: (20)
 
Viper1GJ's Avatar
 
Join Date: Oct 2003
Location: Saint George , SC
Posts: 2,423
Received 330 Likes on 217 Posts
Default

Making Turbine Rails

Turbine rails were cut and dry fit. They had to be aligned with the hole in the rear of the fuse and level with each other. An aluminum bar was used to align with the rear hole. Some adjustments were needed in the slots to get both to line up.



Rails dry fit ready for alignement


Aluminum bar centered on rear hole


Wood clamped across stab formers to align bar with rear hole


1/8" ply doublers epoxied to turbine rails


Turbine rails complete ready for drilling turbine and pipe mounting holes