RCU Forums - View Single Post - SIG Four-Star 60 Build
Thread
:
SIG Four-Star 60 Build
View Single Post
03-31-2019, 10:31 AM
#
68
VincentJ
Join Date: Mar 2011
Location: Peterborough, NH
Posts: 4,582
Likes: 3
Received 118 Likes on
107 Posts
With the 1/16" birch ply in place and epoxied, Former (F-1) is glued in place making sure that it is dead nuts square.
Note- 30 minute epoxy is used in areas indicated. When I use the term "glued", I am referring to Titebond ll being used.
For comparison sake, the right and left fuselage panels are shown. The void in the bottom panel is filled using the same ply removed from the laser cutting sheet.
The plug fits perfectly.
The birch panel it cut and fit into position, now it's time to mix-up some epoxy.
Heavy flat weights are placed on top to ensure good contact between each epoxied panel. Just have to wait for the epoxy to cure...
Last edited by VincentJ; 04-01-2019 at
03:12 AM
.
Reply
Like
VincentJ
View Public Profile
Send a private message to VincentJ
Find More Posts by VincentJ
View iTrader Profile