RCU Forums - View Single Post - TF Beechcraft Bonanza F33A Build
View Single Post
Old 06-27-2019, 10:39 AM
  #20  
VincentJ
 
VincentJ's Avatar
 
Join Date: Mar 2011
Location: Peterborough, NH
Posts: 4,582
Received 118 Likes on 107 Posts
Default



Top sheeting of the stabilizer has been completed. At this point the elevator is attached to the stab and will be sawn off once the bottom is done.







Here's a good shot of how each rib's cradle keeps the stabilizer level to the work table during construction. These tabs will be removed once I flip the stab over.








I'm pleased with the full contact that I got between each rib and the top sheet.



Last edited by VincentJ; 06-27-2019 at 10:49 AM.