Depends on the tank locations. Allot of times though you can plumb them all in series. So you can go from vent line to the small saddle tank. Then the other saddle tank. Then the main center tank to the uat.
Plumbing this way drians each tank 1 at a time. This helps with keeping the last tank full longer getting less air in the system.