I got that spacer shaped and glued to bottom of vertical stabilizer. Trial fit looks pretty good. Next I’ll drill holes for bamboo skewer pieces. These will help hold the glued spacer to the stabilizer bottom rail. They will also go down into the horizontal stabilizer to hold the V stab. and rudder in place. May add triangle stock to sides. Not sure at this point, need to wait until the V stab. Is glued in place.
A cold front came thru this morning. It sure feels good. Goodbye high temperatures!!!