RCU Forums - View Single Post - 40% Extra 300 Construction by-the-numbers
Old 04-22-2006, 07:37 PM
  #10  
Don Szczur
My Feedback: (1)
 
Don Szczur's Avatar
 
Join Date: Jan 2002
Location: Chantilly, VA
Posts: 2,158
Likes: 0
Received 14 Likes on 13 Posts
Default RE: 40% Extra 300 Construction by-the-numbers

Canopy deck sticks are glued in, then the 6 tabs for the mounting blind nuts. A 3/8 spacer is glued in at each location. Finally sheeting is glued on. Make sure you sheet on a flat surface so the deck will not warp. I used wood glue for the stringers and then thick CA on the edges. After wetting the balsa on the outside, it provides for bending of the bala at the bottom part.
Attached Thumbnails Click image for larger version

Name:	Fd91396.jpg
Views:	42
Size:	24.0 KB
ID:	449646   Click image for larger version

Name:	Wr55547.jpg
Views:	49
Size:	21.2 KB
ID:	449647   Click image for larger version

Name:	Yd81570.jpg
Views:	39
Size:	19.1 KB
ID:	449648   Click image for larger version

Name:	Zt52760.jpg
Views:	40
Size:	27.6 KB
ID:	449649   Click image for larger version

Name:	Qb36382.jpg
Views:	33
Size:	27.5 KB
ID:	449650   Click image for larger version

Name:	Lc49322.jpg
Views:	42
Size:	21.3 KB
ID:	449651