RCU Forums - View Single Post - BVM Mig 15 build
View Single Post
Old 02-16-2007, 10:49 AM
  #20  
John Redman
My Feedback: (8)
 
Join Date: Dec 2001
Location: Lancaster, CA IL
Posts: 2,317
Likes: 0
Received 1 Like on 1 Post
Default RE: BVM Mig 15 build

My upper rudder is operational and has a hidden linkage. Pull-pull with an 8411 using welding rod (3/16" diameter) for the torque rod into the bottom of the rudder. Works very well. I used 3/16" diameter welding rod (brass bushed) for the torque rod between the upper and lower rudder as well.

If you conceal the elevator linkages this is done with 5/32" welding rod I believe. Dave Ribbe has them on his. I did not conceal my elevator linkages.