RCU Forums - View Single Post - Electric Osmose Building
View Single Post
Old 10-31-2007, 03:27 AM
  #27  
rolyjr
Member
 
Join Date: Sep 2007
Location: Johannesburg, SOUTH AFRICA
Posts: 36
Likes: 0
Received 0 Likes on 0 Posts
Default RE: Electric Osmose Building

Hi Isaac,

Still busy with form the spars - coming along nicely. Great photos you put through. A couple of questions:

What is the measurement for the leading edge to the hole (leading side of the hole) you cut for the incidence adjuster on the root? Suppose the measurement is not entirely critical, but would be useful to have a reference point.

I see you have made either a hole, or an indentation on the dowel in each wing tube. Not sure what the holes/identations are for? (excuse the ignorance).

Thanks,
Roly