RE: Spot On 50 Build log.
I finally got the DEPS (carbon elevator pushrods) from Central and as suspected there's another once saved. I got the throttle pushrod done making use of one of the old engine mount screw holes. I used an HS85BB for the servo.
I started the tank installation and found that it has to be installed inverted with respect to the instructions to properly line up with the opening in the firewall. My hands cramped up trying to work in that tiny space so I started on the DEPS installation. Very smooth operation so far. I just cleared both openings at the supporting tube. The carbon rods are the same size as the original steel rods so the fit is perfect.