Savage ss build time
#1
Senior Member
Thread Starter
My Feedback: (2)
Join Date: Oct 2003
Location: Hannibal,
MO
Posts: 363
Likes: 0
Received 0 Likes
on
0 Posts
Savage ss build time
how long does it take to build the ss? Also could someone who has built r/c airplanes and is a probly intermidiate builder build it? I havn't built anything like this. Does it require soldering? How hard is the ss to fix? How does it compare performance wise to the t-maxx for bacyard bashing?
Thanks
Ethan
Thanks
Ethan
#3
Member
Join Date: Feb 2004
Location: white plains, NY
Posts: 39
Likes: 0
Received 0 Likes
on
0 Posts
RE: Savage ss build time
the savage ss was my first - it took 16 hours and i built it straight from start to finish. easy. i've torn it down several times now. ave fun, and dont drink and drive.
#4
My Feedback: (28)
Join Date: May 2002
Location: Mt. Pleasant,
PA
Posts: 67
Likes: 0
Received 0 Likes
on
0 Posts
RE: Savage ss build time
It's not bad at all - I'm currently building mine and the worst thing is waiting for the hopup parts to arrive. I'm jumping threw the manual as I can because the first thing is the diff assy. and I'm adding GPM diff locks so I jumped around like building the shocks (just for fun because I'm adding piggyback shocks) which is the longest and toughest thing to do but look at about 2 good evening of building or 8 hours.