RE: Fokker DRI Build Along
1 Attachment(s)
Progress report. My Fiberglass Specialties Cowlng arrived. This is what is on my other DR1.
|
RE: Fokker DRI Build Along
That is quite an amazing build Ron.
Phil |
RE: Fokker DRI Build Along
Thanks Phil, looking forward to seeing pictures of your project.
Ron |
RE: Fokker DRI Build Along
ORIGINAL: roncannell Thanks Phil, looking forward to seeing pictures of your project. Ron Phil |
RE: Fokker DRI Build Along
What does the BUSA provide the with the kit for a cowl? This is going to be my winter build... how many months till winter???
|
RE: Fokker DRI Build Along
Busa includes an abs plastic cowl.
|
RE: Fokker DRI Build Along
Kitbuilder, if you like building wings you will love it!
|
RE: Fokker DRI Build Along
...
|
RE: Fokker DRI Build Along
1 Attachment(s)
Question ? For painting my DuBro 7 inch wheels. Should I simply mask off the rubber or remove the rubber tire from the wheel? I am planning on scuffing the wheel with a scothbright pad. Any advice?
|
RE: Fokker DRI Build Along
You cannot remove the tire from the rims, they are "keyed" into them.
But you can roll them back enough to get paper or tape in between the tire and rim. Del |
RE: Fokker DRI Build Along
Thank you Del, thats what I needed to know.
Ron |
RE: Fokker DRI Build Along
Always happy to help when I can..................:)
Del |
RE: Fokker DRI Build Along
http://shop.dubro.com/products/produ...7.0.0.0?pp=12&
Ron, check this link, it shows a cross section........... Del |
RE: Fokker DRI Build Along
I dont mind building wings... Looking at the fuse pics it's just a larger concept of the 1/6 N17. Looks identical except for the stringers creating the rouded sides. Did the DR1 have a sprung tail skid?
|
RE: Fokker DRI Build Along
1 Attachment(s)
Mounted the Fiberglass specialties cowling. Taking measurements from my other DR1 for Firewall drilling. Plan on using a Zenoah 26cc.
|
RE: Fokker DRI Build Along
1 Attachment(s)
Some pictures of my Radio install from my first build. I will be making some minor changes.
|
RE: Fokker DRI Build Along
1 Attachment(s)
I will again mount the Ignition above the engine to get the weight forward.
|
RE: Fokker DRI Build Along
Doe the ignition or tank not need to be in some sort of foam to help with vibration. I'm asking so I can learn because glow fuel will bubble/foam up. Is this not an issue?
|
RE: Fokker DRI Build Along
1 Attachment(s)
Kitbuilder, My tank sets on a 1/4 piece of Foam. The ignition had no instructions of cushioning and I have had no problems. Zenoah does warn against wrapping the ignition due to overheating. The back is to be left exposed for cooling. I left a 1/2 inch gap between the firewall.
|
RE: Fokker DRI Build Along
1 Attachment(s)
Eight new holes in the firewall.
|
RE: Fokker DRI Build Along
NIce !!!! watching in anticipation :D I just have my tank on about 1/4 - 1/2 piece of foam no problems at all. Zenoah 26 is my engine also.
|
RE: Fokker DRI Build Along
Covering has begun!
|
RE: Fokker DRI Build Along
1 Attachment(s)
Some covering pics. It has been very HOT here, so I decided on covering inside. Its simply too hot in my garage to paint and I didnt want to wait till October.
|
RE: Fokker DRI Build Along
1 Attachment(s)
I under-estimated my covering order and Ran out of Green and Yellow Solartex. No one in Phoenix stocks this stuff. So I will be delayed a bit.
|
RE: Fokker DRI Build Along
Looking really good Ron. Should be interesting in the air!
Phil |
All times are GMT -8. The time now is 03:21 PM. |
Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.