Skymaster L-39 Assembly and Scheme Change    Gallery
View related threads: (in this forum | in all forums)

Logged in as Guest



Users viewing this topic: none
    Search This Thread  
 
Printable Version


King Tech K180G
Seller:  Modellbau USA
Details:   $2,895.00   |  5/24/2013   |  Classified Ad
We will rotate YOUR AD in this spot if you select "Forum Featured" when placing or editing your ad!

All Forums >> RC Airplanes >> RC Jets >> Skymaster L-39 Assembly and Scheme Change
Page: [1] 2 3   next >   >>  

Tower Hobbies Get Coupon Codes Brands  
Login
Message << Older Topic   Newer Topic >>
Skymaster L-39 Assembly and Scheme Change - 9/20/2010 1:51 AM   
k_sonn



Posts: 2297
Score: 123
Joined: 2/15/2002
Last Login: 5/17/2013
From: Issaquah, WA, USA
Status: offline
I started assembling the Skymaster L-39 today.  I started with hinging the rudder.  The first thing I noticed was the pre-drilled holes for the pin hinges in the trailing edge of the verticle stab did not line up with the pre-drilled holes in the rudder.  I elected to fix this by drilling out the pre-drilled holes in the trailing edge of the verticle stab and epoxying inch and a half long pieces of 1/4 inch hard wood dowel (photo 1).  The holes were drilled to line up with the pre-drilled holes in the rudder (photo 2).  The hinge line was found and reliefs were filed into the leading edge of the rudder so the pin hinges could be recessed (photo 3).  The last two photos show the rudder installed.

Kirk

Attachments
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize


_____________________________

Schubeler USA Demo Team
"Schubeler - The Future Of Electric Jets"

Hide Signatures
       Post #: 1

RE: Skymaster L-39 Assembly and Scheme Change - 9/20/2010 2:18 AM   
trioval00


 

Posts: 2334
Score: 110
Joined: 7/4/2002
Last Login: 5/25/2013
From: wilkes barre, PA, USA
Status: offline
hey Kirk, keep doing what your doing. I had the same issue with mine. I filled the holes on the fuse end of the rudder , layed a strip of balsa over that, then re drilled.
here is a link to a great building thread on the Skymaster's L-39.

http://www.rcuniverse.com/forum/m_9076297/mpage_16/key_/tm.htm.....

you will enjoy this jet, very easy to fly and and moves along really nice with a P-80 in her.

Are you planning on attending Hamburg's Jet Jamboree? I will have mine there and will be able to answer any question you might have..

If you should have any other question. ask.


Mark

_____________________________

JPO District III rep - Turbine CD,
www.jpnepa.org

Hide Signatures

(in reply to k_sonn)
       Post #: 2

RE: Skymaster L-39 Assembly and Scheme Change - 9/20/2010 8:28 PM   
k_sonn



Posts: 2297
Score: 123
Joined: 2/15/2002
Last Login: 5/17/2013
From: Issaquah, WA, USA
Status: offline

quote:

ORIGINAL: trioval00

hey Kirk, keep doing what your doing. I had the same issue with mine. I filled the holes on the fuse end of the rudder , layed a strip of balsa over that, then re drilled.
here is a link to a great building thread on the Skymaster's L-39.

http://www.rcuniverse.com/forum/m_9076297/mpage_16/key_/tm.htm.....

you will enjoy this jet, very easy to fly and and moves along really nice with a P-80 in her.

Are you planning on attending Hamburg's Jet Jamboree? I will have mine there and will be able to answer any question you might have..

If you should have any other question. ask.


Mark

Thanks Mark.  DId you come across any other issues during your build?

I've read through that build thread a couple of times.  It is an execellent build thread.  I started this one because I will be changing the scheme and didn't want that changing the direction of the build thread.

I won't be able to make it to Hamburg.  I'm in the Pacific Northwest until early March. 

Kirk


_____________________________

Schubeler USA Demo Team
"Schubeler - The Future Of Electric Jets"

Hide Signatures

(in reply to trioval00)
       Post #: 3

RE: Skymaster L-39 Assembly and Scheme Change - 9/20/2010 9:46 PM   
trioval00


 

Posts: 2334
Score: 110
Joined: 7/4/2002
Last Login: 5/25/2013
From: wilkes barre, PA, USA
Status: offline
Kirk, the only other major issues , and they are not really that big is,

1st, if you are using the gear that came with the kit, it's a must, get the BVM upgrade gear springs. mine collapsed on the first time I wanted to do a run up at the airport, and it set me back a few weeks before first flight.

2nd, again, if you are using the gear that comes with it, the nose of the L-39 will sit a little to low. On my first flight, it took a long time to break ground. my sollution was to add a 1/4 square stock to the rails, this will lower the gear 1/4 inch and solved all my problems. you might have another sollution.

3rd. Turbine, I set my thrust tube in as far forward as possible, then I set the P-80 accordingly. I wished the pipe was 2 inches longer but......... and for the balance I installed all 3 batteries in the nose. I use 2- 2300 nimh 6.0 volt and 1- 3500 nimh 7.2 Venom brand battery for the ECU, and with this set up, I only had to add a little weigth to the front. Yors will come out tail heavy, they all do.

4th. I built most of the electronics and gear under the cocpits, but in the rear compartment, I installed all the important gear, such as, on/off switches, air fill valves, propane and kero fills, I/0 board. this would make it easy not having to pull the cockpits out every time I go to fly.....

in the pic you can see the turbine stuffed into the inlet, I nolonger have it there. as I mentioned, set the tail pipe so it just clears the tail, then set the turbine.

enjoy and hope this works................

Attachments
Click to see fullsize image.
Click for fullsize


_____________________________

JPO District III rep - Turbine CD,
www.jpnepa.org

Hide Signatures

(in reply to k_sonn)
       Post #: 4

RE: Skymaster L-39 Assembly and Scheme Change - 9/27/2010 5:35 AM   
k_sonn



Posts: 2297
Score: 123
Joined: 2/15/2002
Last Login: 5/17/2013
From: Issaquah, WA, USA
Status: offline
Since I'm changing the scheme I wanted to remove the paint before working on the install.  This time I decided to strip the paint instead of samding it off.  I used CitriStripe and it worked well.  It took 2 coats to strip the vertical and horizontal stabs and 3 coats to strip the rear section of the fuse (the red and blue paint was pretty thick).  The 1st photo shows the rear section of the fuse before applying the striper.  The 2nd photos shows the results of striper after sitting for about 20 minutes.  The 3rd photo shows what the first coat of striper removed.  Two more coats were applied to completely remove the red and blue paint.  The 4th and 5th photos shows the results after the last coat of striper is removed and the surface is washed with CitriStrip Cleaner and steel wool.

Kirk

Attachments
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize


_____________________________

Schubeler USA Demo Team
"Schubeler - The Future Of Electric Jets"

Hide Signatures

(in reply to trioval00)
       Post #: 5

RE: Skymaster L-39 Assembly and Scheme Change - 9/27/2010 5:40 AM   
k_sonn



Posts: 2297
Score: 123
Joined: 2/15/2002
Last Login: 5/17/2013
From: Issaquah, WA, USA
Status: offline

quote:

ORIGINAL: trioval00

Kirk, the only other major issues , and they are not really that big is,

1st, if you are using the gear that came with the kit, it's a must, get the BVM upgrade gear springs. mine collapsed on the first time I wanted to do a run up at the airport, and it set me back a few weeks before first flight.

2nd, again, if you are using the gear that comes with it, the nose of the L-39 will sit a little to low. On my first flight, it took a long time to break ground. my sollution was to add a 1/4 square stock to the rails, this will lower the gear 1/4 inch and solved all my problems. you might have another sollution.

3rd. Turbine, I set my thrust tube in as far forward as possible, then I set the P-80 accordingly. I wished the pipe was 2 inches longer but......... and for the balance I installed all 3 batteries in the nose. I use 2- 2300 nimh 6.0 volt and 1- 3500 nimh 7.2 Venom brand battery for the ECU, and with this set up, I only had to add a little weigth to the front. Yors will come out tail heavy, they all do.

4th. I built most of the electronics and gear under the cocpits, but in the rear compartment, I installed all the important gear, such as, on/off switches, air fill valves, propane and kero fills, I/0 board. this would make it easy not having to pull the cockpits out every time I go to fly.....

in the pic you can see the turbine stuffed into the inlet, I nolonger have it there. as I mentioned, set the tail pipe so it just clears the tail, then set the turbine.

enjoy and hope this works................

Thanks for the info Mark.  I ordered the landing gear spring and fuel tank fitting upgrades from BVM.  Nice install.

Kirk

_____________________________

Schubeler USA Demo Team
"Schubeler - The Future Of Electric Jets"

Hide Signatures

(in reply to trioval00)
       Post #: 6

RE: Skymaster L-39 Assembly and Scheme Change - 10/19/2010 6:03 PM   
k_sonn



Posts: 2297
Score: 123
Joined: 2/15/2002
Last Login: 5/17/2013
From: Issaquah, WA, USA
Status: offline
Finally completed the paint stripping.  The airframe is now 2 pounds lighter. 

Kirk

Attachments
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize


_____________________________

Schubeler USA Demo Team
"Schubeler - The Future Of Electric Jets"

Hide Signatures

(in reply to k_sonn)
       Post #: 7

RE: Skymaster L-39 Assembly and Scheme Change - 10/23/2010 10:20 PM   
smchale



Posts: 2184
Score: 115
Joined: 6/19/2002
Last Login: 5/25/2013
From: Malvern, PA, USA
Status: offline
Kirk,
Nice work. Amazing that you were able to pull that much weight out just by removing paint. Bet you can see surface detail again?
What scheme are you going to go with (I assume you aren't going to leave it in this winter scheme!? ).

_____________________________

Sean McHale
"Strive for simplicity. You never have to repair what you leave out." - Bill Lear

Hide Signatures

(in reply to k_sonn)
       Post #: 8

RE: Skymaster L-39 Assembly and Scheme Change - 10/24/2010 4:15 AM   
AnthonyW



Posts: 402
Score: 100
Joined: 2/1/2002
Last Login: 5/25/2013
From: Raleigh, NC, USA
Status: offline
Curious,
Could you not get a all primer version?


Hide Signatures

(in reply to smchale)
       Post #: 9

RE: Skymaster L-39 Assembly and Scheme Change - 11/1/2010 5:09 PM   
k_sonn



Posts: 2297
Score: 123
Joined: 2/15/2002
Last Login: 5/17/2013
From: Issaquah, WA, USA
Status: offline
More progress...
Photo 1 - Panels going into the rear fuse section were fuel proofed and the components were laid out and installed.  The UAT craddle was glued together and fuel proofed.
Photo 2 - The ECU panel installed.  It's screwed to a piece of 3/8 square piece of bass wood that's epoxied to the bottom of the turbine mounting rail.
Photo 3 - The fuel panel and UAT craddled installed (the same way as the ECU panel). 
Photo 4 - The power panel clamped in place.  I need to make some mounting blocks.
Photo 5 - The pipe is installed.  BVM has an interesting way of installing the pipe using carbon fiber rods.  Works really well.
Photo 6 - All major components installed.

Kirk

Attachments
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize


< Message edited by k_sonn -- 11/1/2010 7:35 PM >


_____________________________

Schubeler USA Demo Team
"Schubeler - The Future Of Electric Jets"

Hide Signatures

(in reply to AnthonyW)
       Post #: 10

RE: Skymaster L-39 Assembly and Scheme Change - 11/1/2010 5:11 PM   
k_sonn



Posts: 2297
Score: 123
Joined: 2/15/2002
Last Login: 5/17/2013
From: Issaquah, WA, USA
Status: offline
Thanks.  Still looking at schemes.

quote:

ORIGINAL: smchale

Kirk,
Nice work. Amazing that you were able to pull that much weight out just by removing paint. Bet you can see surface detail again?
What scheme are you going to go with (I assume you aren't going to leave it in this winter scheme!? ).



_____________________________

Schubeler USA Demo Team
"Schubeler - The Future Of Electric Jets"

Hide Signatures

(in reply to smchale)
       Post #: 11

RE: Skymaster L-39 Assembly and Scheme Change - 11/1/2010 5:13 PM   
k_sonn



Posts: 2297
Score: 123
Joined: 2/15/2002
Last Login: 5/17/2013
From: Issaquah, WA, USA
Status: offline
I could have ordered an all white one but I got this one on sale for less than the cost of the white one. 
quote:

ORIGINAL: AnthonyW

Curious,
Could you not get a all primer version?




_____________________________

Schubeler USA Demo Team
"Schubeler - The Future Of Electric Jets"

Hide Signatures

(in reply to AnthonyW)
       Post #: 12

RE: Skymaster L-39 Assembly and Scheme Change - 3/30/2012 10:04 PM   
k_sonn



Posts: 2297
Score: 123
Joined: 2/15/2002
Last Login: 5/17/2013
From: Issaquah, WA, USA
Status: offline

I started this project a couple of years ago and got side tracked with a few other projects, but now it's time to come back to this one.

The elevator servos (photo 1) and flap servos (photo 2) have been installed.  I deviated from the instructions and mounted the elevator servos to the side of the fuse so that the horizontal stabs slide right over them.
 
I did run into a problem when attempting to install the aileron servos.  The ply servo mounts were either installed a little too far forward or the servo covers were cut in the wrong location (photo 3).  To solve this I was thinking about cutting the servo opening further forward so I can get to the forward mount and make new servo covers.  Any other ideas?

Last couple of photos show the scheme I have settled on.
 
Kirk



Attachments
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize


< Message edited by k_sonn -- 3/30/2012 10:29 PM >


_____________________________

Schubeler USA Demo Team
"Schubeler - The Future Of Electric Jets"

Hide Signatures

(in reply to k_sonn)
       Post #: 13

RE: Skymaster L-39 Assembly and Scheme Change - 3/31/2012 1:39 AM   
smchale



Posts: 2184
Score: 115
Joined: 6/19/2002
Last Login: 5/25/2013
From: Malvern, PA, USA
Status: offline

quote:

ORIGINAL: k_sonn
 
I did run into a problem when attempting to install the aileron servos.  The ply servo mounts were either installed a little too far forward or the servo covers were cut in the wrong location (photo 3).  To solve this I was thinking about cutting the servo opening further forward so I can get to the forward mount and make new servo covers.  Any other ideas?

Last couple of photos show the scheme I have settled on.
 
Kirk




Kirk, nice to see you back on this. I'd remove the servo tabs altogether and use Marc's servo dock system (he will cut them for Futaba servos too).
http://www.gbr-jet.com/catalog/index.php?cPath=25&osCsid=4draacsh5gmqvc1ei7tdja4j92
This way you can keep the covers as they are. If the wing is too deep you may need to lift the dock by creating a new floor for the dock to sit on. I have some of you need dimensions.



_____________________________

Sean McHale
"Strive for simplicity. You never have to repair what you leave out." - Bill Lear

Hide Signatures

(in reply to k_sonn)
       Post #: 14

RE: Skymaster L-39 Assembly and Scheme Change - 4/23/2012 2:47 AM   
k_sonn



Posts: 2297
Score: 123
Joined: 2/15/2002
Last Login: 5/17/2013
From: Issaquah, WA, USA
Status: offline

I solved the aileron sevo mouning issue by opening the servo bay a little to expose the forward servo mounting tab.  I'll make new covers.

Photo 1
With the servos installed it was time to install the control horns.  I started with the ailerons and when I cut the slot for the horn I was surprised to see balsa.  Well, that didn't last long.  Neither the flaps nor the elevators had balsa.  Luckliy, the control horns for these are near the root so I cut a section out of each flap and elevator root and made up us balsa blocks to fit. 

Photo 2
The blasa blocks were hysoled in place and when that had set, the blocks were slotted and the contro horns were hysiled in place.

Photos 3 - 8
The shaft on the canopy latch is too short and as a result some have lost the canopy in flight.  Jack Diaz did a mod that eliminated the nedd for the canopy latch.  I used his idea but did the mod differently.  The mod started with removing the caonpy latch (Photo 3).  I want to fill in the slot so a piece of poly ply was glued in place to give the filler some backing (Photo 4).  Next, a 1/8th inch length of aluminum tube was fitted and glued in place and a piece of 4-40 control rod was cut and fitted.  The final length of the rod will be determined once the two halves of the fuse are joined.

Photos 9 & 10
I wanted to get some cooling air into the fuse so I installed some NACA ducts on the front fuse in the area of the rear equipment tray.

Kirk
 



Attachments
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize


_____________________________

Schubeler USA Demo Team
"Schubeler - The Future Of Electric Jets"

Hide Signatures

(in reply to smchale)
       Post #: 15

RE: Skymaster L-39 Assembly and Scheme Change - 4/23/2012 2:49 AM   
k_sonn



Posts: 2297
Score: 123
Joined: 2/15/2002
Last Login: 5/17/2013
From: Issaquah, WA, USA
Status: offline

Photos 11 -13
I made some new mounting rails for the fan. 

Kirk



Attachments
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize


_____________________________

Schubeler USA Demo Team
"Schubeler - The Future Of Electric Jets"

Hide Signatures

(in reply to k_sonn)
       Post #: 16

RE: Skymaster L-39 Assembly and Scheme Change - 4/23/2012 3:10 AM   
smchale



Posts: 2184
Score: 115
Joined: 6/19/2002
Last Login: 5/25/2013
From: Malvern, PA, USA
Status: offline
Nice corrections Kirk. Good to see you back in the workshop!

_____________________________

Sean McHale
"Strive for simplicity. You never have to repair what you leave out." - Bill Lear

Hide Signatures

(in reply to k_sonn)
       Post #: 17

RE: Skymaster L-39 Assembly and Scheme Change - 4/23/2012 10:56 AM   
EDFCrazy


 

Posts: 44
Score: 100
Joined: 1/4/2009
Last Login: 5/25/2013
From: Cumbria, UNITED KINGDOM
Status: offline
Hey Kirk nice to see this project back on track, and going electric. I think this L-39 will fly really well with that fan. i See C&C models are flying what seems like the slightly larger Jetlegend L39 on electric. Hopefully this will give you an indication of the performance you should see.

here is there link and some videos below, videos below are from this link.
http://www.cmodels.it/modelli_jet/l39%20light.htm

http://www.youtube.com/watch?v=wTjoRj1se3U&feature=youtube_gdata_player

http://www.youtube.com/watch?v=8FZI5_ttq54

http://www.youtube.com/watch?v=Q0djV81VCOA

http://www.youtube.com/watch?v=8ruzs-XNrTk&feature=youtube_gdata_player

Hide Signatures

(in reply to smchale)
       Post #: 18

RE: Skymaster L-39 Assembly and Scheme Change - 4/23/2012 6:28 PM   
k_sonn



Posts: 2297
Score: 123
Joined: 2/15/2002
Last Login: 5/17/2013
From: Issaquah, WA, USA
Status: offline

quote:

ORIGINAL: smchale

Nice corrections Kirk. Good to see you back in the workshop!

Thanks Sean.  It is good to be back in the shop

_____________________________

Schubeler USA Demo Team
"Schubeler - The Future Of Electric Jets"

Hide Signatures

(in reply to smchale)
       Post #: 19

RE: Skymaster L-39 Assembly and Scheme Change - 4/23/2012 6:38 PM   
k_sonn



Posts: 2297
Score: 123
Joined: 2/15/2002
Last Login: 5/17/2013
From: Issaquah, WA, USA
Status: offline
Hi Simon.  It's good to hear from you.  Thanks for the video.  The fan you see in the pics above is the 1st version of the DS-77.  I removed it from the Panther so I could start getting the setup together.  I received word from Schubeler last week that the 25 pound thrust DS-77 will be shipped in mid-May.  Looking forward to getting that one and installing it in the L-39

Kirk
quote:

ORIGINAL: EDFCrazy

Hey Kirk nice to see this project back on track, and going electric. I think this L-39 will fly really well with that fan. i See C&C models are flying what seems like the slightly larger Jetlegend L39 on electric. Hopefully this will give you an indication of the performance you should see.

here is there link and some videos below, videos below are from this link.
http://www.cmodels.it/modelli_jet/l39%20light.htm

http://www.youtube.com/watch?v=wTjoRj1se3U&feature=youtube_gdata_player

http://www.youtube.com/watch?v=8FZI5_ttq54

http://www.youtube.com/watch?v=Q0djV81VCOA

http://www.youtube.com/watch?v=8ruzs-XNrTk&feature=youtube_gdata_player



_____________________________

Schubeler USA Demo Team
"Schubeler - The Future Of Electric Jets"

Hide Signatures

(in reply to EDFCrazy)
       Post #: 20

RE: Skymaster L-39 Assembly and Scheme Change - 4/23/2012 7:51 PM   
EDFCrazy


 

Posts: 44
Score: 100
Joined: 1/4/2009
Last Login: 5/25/2013
From: Cumbria, UNITED KINGDOM
Status: offline
25 pound thrust DS-77? whats the wattage to achieve that thrust, im guessing he is running 14s? are you planning on open ducting?

Hide Signatures

(in reply to k_sonn)
       Post #: 21

RE: Skymaster L-39 Assembly and Scheme Change - 4/23/2012 9:48 PM   
k_sonn



Posts: 2297
Score: 123
Joined: 2/15/2002
Last Login: 5/17/2013
From: Issaquah, WA, USA
Status: offline

quote:

ORIGINAL: EDFCrazy

25 pound thrust DS-77? whats the wattage to achieve that thrust, im guessing he is running 14s? are you planning on open ducting?

Hi Simon,

I'm not sure if you are aware that there are 3 models of the 2nd version of the HST fans with thrust ranging between 13 - 25 lbs for the DS-77 HST and 12 - 29 lbs of thrust for the DS-94 HST.  The DSM 6745-700 motor powering the 25 lbs thrust DS-77 is also the same motor used in the 29 lbs thrust DS-94 HST.  Surprisingly, the amp draw on the new DS-77 is the same as the amp draw on the first version of the fan but the newer version is lighter, uses a 4 pole motor instead of a 2 pole motor, and produces about 5 more pounds of thrust. 

To answer your question, the DS-77 DSM 6745-700 HST produces 25 pounds of thrust at 8550 watts on 14 cells (good cells).  The DS-94 DSM 6745-700 HST produces 29 pounds of thrust at 10,000 watts on 14 cells (good cells).

The L-39 has enough intake area to support the DS-77 but the ducting is very bad with two near 90 degree bends so I will run this setup as open ducted. 

Kirk

_____________________________

Schubeler USA Demo Team
"Schubeler - The Future Of Electric Jets"

Hide Signatures

(in reply to EDFCrazy)
       Post #: 22

RE: Skymaster L-39 Assembly and Scheme Change - 4/24/2012 10:55 AM   
EDFCrazy


 

Posts: 44
Score: 100
Joined: 1/4/2009
Last Login: 5/25/2013
From: Cumbria, UNITED KINGDOM
Status: offline
Thanks Kirk i didnt know that there were these new versions. is there a 77 or 94 that is intended for the 12 cells for roughly 6kw? I wonder why Daniel doesnt supply his new fans, as fan only, like use to as an alternative to his pnp units?

Hide Signatures

(in reply to k_sonn)
       Post #: 23

RE: Skymaster L-39 Assembly and Scheme Change - 4/24/2012 8:26 PM   
k_sonn



Posts: 2297
Score: 123
Joined: 2/15/2002
Last Login: 5/17/2013
From: Issaquah, WA, USA
Status: offline


quote:

ORIGINAL: EDFCrazy

Thanks Kirk i didnt know that there were these new versions. is there a 77 or 94 that is intended for the 12 cells for roughly 6kw? I wonder why Daniel doesnt supply his new fans, as fan only, like use to as an alternative to his pnp units?

Besides the rotor, one of the main difference between the Schubeler HST and HDT fans is that HST fans are built from the motor up, making the motor an integral part of the fan.

There are a couple of models that run in the 6kw range, but they run on 13 or 14 cells.  Below are the numbers.  I like the numbers for the DS-77 6740-650.  It weighs less than the first version of the DS-77, produces the same amount of thrust, and runs at 45 less amps.  If you've seen the video of the 1st version of the DS-77 flying my Ziroli Panther you'll see that it doesn't lack in power.

DS-77 6740-650
Cell Count: 14
Voltage: 51.8
Amp: 119
Watts: 6164
Thrust: 20.7
RPM:28,000

DS-94 6740-650
Cell Count: 13
Voltage: 48.1
Amp: 121
Watts: 5820
Thrust: 21.4
RPM:26,000

DS-94 6740-650
Cell Count: 14
Voltage: 51.8
Amp: 135
Watts: 6993
Thrust: 23.8
RPM:27,000

Kirk



_____________________________

Schubeler USA Demo Team
"Schubeler - The Future Of Electric Jets"

Hide Signatures

(in reply to EDFCrazy)
       Post #: 24

RE: Skymaster L-39 Assembly and Scheme Change - 4/25/2012 12:59 PM   
gamalierlozada


 

Posts: 85
Score: 100
Joined: 5/23/2008
Last Login: 4/7/2013
From: Fayetteville, NC, USA
Status: offline
I want to see the final outcome of this build. I ordered a FeiBao L-39 (Edf version) and have been talking to Mike Warren to see which fan version would benefit my application. Also been talking to other respected EDF builder from Down Under (no name mention since this is a Schuebeler thread and I respect that ) and I will decide between those 2 units. So far the Schuebeler numbers look more appealing but unit weight is also a decisive factor. That's kind the only thing I would love this unit to be a little lighter a 2-2.4 pounds. That would be awesome considering the power it produces. Let's see what is Daniel's input for my application. Good luck with your build!

Hide Signatures

(in reply to k_sonn)
       Post #: 25

Page:   [1] 2 3   next >   >>  
All Forums >> RC Airplanes >> RC Jets >> Skymaster L-39 Assembly and Scheme Change
Page: [1] 2 3   next >   >>  





Jump to:


 
Google 



Search | Marketplace | Event Calendar | Local Clubs | Magazine | Product Ratings | New Products | Discussion Forums

Photo Gallery | Instructor Search | Field|Track|Marina Search

Advertisers | Hobby Vendor Resources | Rate Manufacturers | Sign In/Sign Up

SITE MAP!   : :   FORUM RULES

RC Universe is a service of Internet Brands, Inc. Copyright © 2001-2013.

Charities we support that also need your help
Yorkie Rescue | Humane Society | ASPCA | Crohn's-Colitis America


1.404RCU1