MOTORMAN37
Posts: 2044
Joined: 10/26/2002 From: CLINTONVILLE,
WI, USA Status: offline
|
Horizontal stab is done, tomorrow night I will tackle the vertical stab and landing gear. Other than a few gussets and some triangle stock for the landing gear, the fuse will be stock. The landing gear rails are actually dove tailed into the firewall and the first bulhead, but because of the swept landing gear there is alot of leverage on the front joint. I have a hard time assembling ARF's because of my engineering background, I like to perfect everything. I am still undecided on a powerplant. The plane actually looks quite large sitting there on the bench. It will be one of my Magnum's though, I just don't know if I want to run a 4 or 2 stroke in this one.
|