KT Metal Upgrades
#1
Senior Member
Thread Starter
Join Date: May 2009
Location: Evans, GA
Posts: 1,506
Likes: 0
Received 0 Likes
on
0 Posts
KT Metal Upgrades
Hi All,
I ordered the metal upgrades for the Matorro KT( boxes, tracks, sprockets and idler ). The boxes were bent so bad that I couldn't even turn them by hand. Took them apart and straightened the frame. I'm running them in now. Will report later on how good they work. The tracks and drive sprocket are pretty straight forward, but the idler came assembled and had a push pin like the HL Tiger I road wheels. I was wondering if anyone had substituted the pin for a screw and just how they did it. Any help will as always be greatly appreciated.
Thanks in advance.
Jim
I ordered the metal upgrades for the Matorro KT( boxes, tracks, sprockets and idler ). The boxes were bent so bad that I couldn't even turn them by hand. Took them apart and straightened the frame. I'm running them in now. Will report later on how good they work. The tracks and drive sprocket are pretty straight forward, but the idler came assembled and had a push pin like the HL Tiger I road wheels. I was wondering if anyone had substituted the pin for a screw and just how they did it. Any help will as always be greatly appreciated.
Thanks in advance.
Jim
#2
Senior Member
Join Date: Feb 2011
Location: West Melbourne,
FL
Posts: 248
Likes: 0
Received 0 Likes
on
0 Posts
RE: KT Metal Upgrades
I would be happy with the push pin, and maybe drill a small hole paralell and use a set screw. WIth screws, one side will work its way out because of the rotation.