Charlie Kellogg's TBM Avenger Build
#3026
Chic,
Truly awesome, I'm more than impressed.
Garage workshop up to 99 degrees Avenger hanger 100+
Almost finished the dive brake and balancing jig, need to get into the shop really early
Larry
Truly awesome, I'm more than impressed.
Garage workshop up to 99 degrees Avenger hanger 100+
Almost finished the dive brake and balancing jig, need to get into the shop really early
Larry
#3027
Thread Starter
My Feedback: (15)
99 - 100 DEGREES, stuff melts at that temperature. Be Safe and Be Well out there. Wow - You almost need to work at night and sleep through the day. Ha, Ha, Home Depot and the First Lady will not accept that. As you said, you will be retired soon enough. Come join the crowd my brother. Chic
#3032
My Feedback: (15)
Join Date: May 2003
Location: Iowa City, Iowa (again!)
Posts: 1,579
Likes: 0
Received 1 Like
on
1 Post
Hahahahaha!
Yes!
Indeed you are... but it's only transient. It will pass... and soon you'll be making low, slow passes with this ship... and it will all be but a distant (yet fond) memory!
You're so close, my friend!!
It all looks spectacular, Chic.
Keep up the TOP-NOTCH work
Noah
Yes!
Indeed you are... but it's only transient. It will pass... and soon you'll be making low, slow passes with this ship... and it will all be but a distant (yet fond) memory!
You're so close, my friend!!
It all looks spectacular, Chic.
Keep up the TOP-NOTCH work
Noah
#3039
Thread Starter
My Feedback: (15)
Reuben - The rivets that Chad Veich made for me are 0.05" and 0.06". My Avenger's scale is 1:5,79 so Chad took that into consideration. ([email protected]). He is a scale modeler also and does compete. Great people to deal with.
Hey Larry, welcome back. Chic
Hey Larry, welcome back. Chic