AJ-2 Construction Revisited    Gallery
View related threads: (in this forum | in all forums)

Logged in as Guest



Users viewing this topic: none
    Search This Thread  
 
Printable Version

All Forums >> RC Airplanes >> Pylon Universe - RC Pylon Racing >> Q-40 Racing >> AJ-2 Construction Revisited
Page: [1] 2 3 4 5   next >   >>  

Tower Hobbies Get Coupon Codes Brands  
Login
Message << Older Topic   Newer Topic >>
AJ-2 Construction Revisited - 5/5/2012 9:09 PM   
sahartman21


 

Posts: 1341
Score: 110
Joined: 11/3/2007
Last Login: 5/22/2013
From: Fritch, TX, USA
Status: offline
This thread will cover building a Kevin Matney's AJ-2 QM kit. The model flies great and is available at competitive pricing.

This is my second time for building this model.

The kit consists of:

1) Fiberglass fuselage
2) Wing cores
3) Tail cores
4) Landing gear
5) Plans

Here is a link to the site:

http://www.matneymodels.com/qm.html

Attachments
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize


Hide Signatures
       Post #: 1

RE: AJ-2 Construction Revisited - 5/5/2012 9:17 PM   
sahartman21


 

Posts: 1341
Score: 110
Joined: 11/3/2007
Last Login: 5/22/2013
From: Fritch, TX, USA
Status: offline
Begin by making wing skins from 1/16" thick balsa sheets.

Use lightweight balsa for the bottom skins. The top skins should be made from medium weight balsa wood.

There is no need to glue the skins together. Just tape them together at this point.

Attachments
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize


Hide Signatures

(in reply to sahartman21)
       Post #: 2

RE: AJ-2 Construction Revisited - 5/5/2012 9:20 PM   
sahartman21


 

Posts: 1341
Score: 110
Joined: 11/3/2007
Last Login: 5/22/2013
From: Fritch, TX, USA
Status: offline
The tail skins are made similarly.

The skins should be about 17" wide as the tail is glued together as one piece.

Attachments
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize


Hide Signatures

(in reply to sahartman21)
       Post #: 3

RE: AJ-2 Construction Revisited - 5/6/2012 4:14 AM   
sahartman21


 

Posts: 1341
Score: 110
Joined: 11/3/2007
Last Login: 5/22/2013
From: Fritch, TX, USA
Status: offline
This wing is sheeted in one process.

The first step is to make a one piece wing skin. This is done by joining sections together with masking tape. The tape between the top and bottom cores makes a hinge.

Next is the addition of carbon fiber on the bottom skin. I tack it in place with 3M77.

Tack pieces of 5" wide fiberglass cloth at the joint between the top and bottom trailing edges. For the time being it will be a hinge between the top and bottom sheets.

A layer of 3/4 ounce fiberglass cloth is placed over the sheeting. The fiberglass cloth makes it easier to get just the right amount of finishing epoxy on the skins. It also adds some strength.


Attachments
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize


Hide Signatures

(in reply to sahartman21)
       Post #: 4

RE: AJ-2 Construction Revisited - 5/6/2012 4:18 AM   
sahartman21


 

Posts: 1341
Score: 110
Joined: 11/3/2007
Last Login: 5/22/2013
From: Fritch, TX, USA
Status: offline
The wing cores and shucks are joined with 3M77 adhesive and masking tape.

Waxed paper is also tacked in place on the shucks to prevent the wing from sticking to the shucks.

Attachments
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize


Hide Signatures

(in reply to sahartman21)
       Post #: 5

RE: AJ-2 Construction Revisited - 5/6/2012 4:22 AM   
sahartman21


 

Posts: 1341
Score: 110
Joined: 11/3/2007
Last Login: 5/22/2013
From: Fritch, TX, USA
Status: offline
Mix about 1 ounce of finishing epoxy per wing half. About 0.1 ounce of 91% rubbing alcohol was added to thin out the epoxy. This was spread over the wing sheeting with a plastic squeegee.

The other wing half is done the same way.

Attachments
Click to see fullsize image.
Click for fullsize


Hide Signatures

(in reply to sahartman21)
       Post #: 6

RE: AJ-2 Construction Revisited - 5/6/2012 4:26 AM   
sahartman21


 

Posts: 1341
Score: 110
Joined: 11/3/2007
Last Login: 5/22/2013
From: Fritch, TX, USA
Status: offline
Cut the slot for the vertical sheer of carbon fiber. This acts like a spar and adds significant strength to the wing. Don't leave it out.

Mix about 0.4 ounce of finishing epoxy and spread it into place using an epoxy brush. Add the carbon fiber making sure there is a good glue joint.

Attachments
Click to see fullsize image.
Click for fullsize


Hide Signatures

(in reply to sahartman21)
       Post #: 7

RE: AJ-2 Construction Revisited - 5/6/2012 4:34 AM   
sahartman21


 

Posts: 1341
Score: 110
Joined: 11/3/2007
Last Login: 5/22/2013
From: Fritch, TX, USA
Status: offline
The wing cores were slid between the wing sheeting. This was then placed between the shucks.

Verify the parts are straight by reviewing the markings on the sides of the cores. Kevin added marks so you can tell the wing is straight.

Temporarily pin the parts together and then tape parts together with masking tape. The pins should be removed prior to adding the parts to the vacuum bag. You don't need holes.

Attachments
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize


Hide Signatures

(in reply to sahartman21)
       Post #: 8

RE: AJ-2 Construction Revisited - 5/6/2012 4:39 AM   
sahartman21


 

Posts: 1341
Score: 110
Joined: 11/3/2007
Last Login: 5/22/2013
From: Fritch, TX, USA
Status: offline
The bag is made from 4 mil thick plastic tarp and is sealed with latex caulking. A piece of rope goes around the perimeter of the wing and allows a channel for the vacuum to flow.

About 6" of Hg vacuum is applied and parts are allowed to dry overnight.

Attachments
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize


< Message edited by sahartman21 -- 5/6/2012 3:23 PM >


Hide Signatures

(in reply to sahartman21)
       Post #: 9

RE: AJ-2 Construction Revisited - 5/6/2012 9:30 PM   
sahartman21


 

Posts: 1341
Score: 110
Joined: 11/3/2007
Last Login: 5/22/2013
From: Fritch, TX, USA
Status: offline
Trim off the outside of bag to remove parts. That way you don't have to mess with the caulking.

The leading and trailing edges are trimmed flush to the shucks.

Remove the tape and lightly sand the edges.

Attachments
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize


Hide Signatures

(in reply to sahartman21)
       Post #: 10

RE: AJ-2 Construction Revisited - 5/6/2012 9:34 PM   
sahartman21


 

Posts: 1341
Score: 110
Joined: 11/3/2007
Last Login: 5/22/2013
From: Fritch, TX, USA
Status: offline
I glued the leading edge on with 6-minute epoxy. Draw a line down the center of the leading edge and then shape as desired.

The trailing edge was shaped with a sanding block. Sand down to a sharp trailing edge. The fiberglass cloth makes a nice thin edge.



Attachments
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize


Hide Signatures

(in reply to sahartman21)
       Post #: 11

RE: AJ-2 Construction Revisited - 5/13/2012 11:42 PM   
sahartman21


 

Posts: 1341
Score: 110
Joined: 11/3/2007
Last Login: 5/22/2013
From: Fritch, TX, USA
Status: offline
The tail surface is a skinned foam core.

The balsa sheets should be about 1/4" wider than the shucks.

A piece of 0.021" thick carbon fiber is used at the joint.

Finishing epoxy is squeegeed on the balsa sheeting.

Lay the cores on the sheeting. Mix some micro-balloons and finishing epoxy. Apply the mix on the edges and carbon fiber.

Lay the top sheeting on and tape the sheets together.

Attachments
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize


< Message edited by sahartman21 -- 5/14/2012 12:10 AM >


Hide Signatures

(in reply to sahartman21)
       Post #: 12

RE: AJ-2 Construction Revisited - 5/14/2012 12:12 AM   
sahartman21


 

Posts: 1341
Score: 110
Joined: 11/3/2007
Last Login: 5/22/2013
From: Fritch, TX, USA
Status: offline
The tail surface was placed between layers of peel ply (nylon fabric) and placed in the vacuum bag.

I'm building two AJ-2 models at this time.

Attachments
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize


Hide Signatures

(in reply to sahartman21)
       Post #: 13

RE: AJ-2 Construction Revisited - 5/14/2012 1:03 AM   
sahartman21


 

Posts: 1341
Score: 110
Joined: 11/3/2007
Last Login: 5/22/2013
From: Fritch, TX, USA
Status: offline
After a couple hours the tail surfaces were removed from the vacuum bag and peel ply.

Here is what one looks like after cleaning it up a little. It weighs about 1.25 ounces.

I'm going to allow it to dry further before shaping.

Attachments
Click to see fullsize image.
Click for fullsize


Hide Signatures

(in reply to sahartman21)
       Post #: 14

RE: AJ-2 Construction Revisited - 5/19/2012 5:04 AM   
sahartman21


 

Posts: 1341
Score: 110
Joined: 11/3/2007
Last Login: 5/22/2013
From: Fritch, TX, USA
Status: offline
While you guys were dreaming of your next race a new wing was being born.

This one is similar to the earlier post except it uses carbon tow for reinforcement on the bottom.

Good luck MOKAN!

Attachments
Click to see fullsize image.
Click for fullsize


Hide Signatures

(in reply to sahartman21)
       Post #: 15

RE: AJ-2 Construction Revisited - 5/19/2012 8:36 PM   
sahartman21


 

Posts: 1341
Score: 110
Joined: 11/3/2007
Last Login: 5/22/2013
From: Fritch, TX, USA
Status: offline
This morning the leading edge (1/4" x 3/8 balsa) was glued and shaped (with knife and sanding block).

The trailing edge was shaped with a sanding block.

What's better than one AJ-2? Two of course!

Attachments
Click to see fullsize image.
Click for fullsize


Hide Signatures

(in reply to sahartman21)
       Post #: 16

RE: AJ-2 Construction Revisited - 5/20/2012 10:01 PM   
sahartman21


 

Posts: 1341
Score: 110
Joined: 11/3/2007
Last Login: 5/22/2013
From: Fritch, TX, USA
Status: offline
I installed the firewall (3/8" thick aircraft plywood) and engine.

The pictures show the sequence of events.



Attachments
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize


Hide Signatures

(in reply to sahartman21)
       Post #: 17

RE: AJ-2 Construction Revisited - 5/20/2012 10:08 PM   
sahartman21


 

Posts: 1341
Score: 110
Joined: 11/3/2007
Last Login: 5/22/2013
From: Fritch, TX, USA
Status: offline
More firewall installation pictures:



Attachments
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize


Hide Signatures

(in reply to sahartman21)
       Post #: 18

RE: AJ-2 Construction Revisited - 5/20/2012 10:13 PM   
sahartman21


 

Posts: 1341
Score: 110
Joined: 11/3/2007
Last Login: 5/22/2013
From: Fritch, TX, USA
Status: offline
More firewall installation pictures:

Vaseline is spread on the backside of the motor mount prior to epoxying it to the firewall.

Attachments
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize


Hide Signatures

(in reply to sahartman21)
       Post #: 19

RE: AJ-2 Construction Revisited - 5/20/2012 10:18 PM   
sahartman21


 

Posts: 1341
Score: 110
Joined: 11/3/2007
Last Login: 5/22/2013
From: Fritch, TX, USA
Status: offline
The front beams of of the motor mount are attached with epoxy and fiberglass cloth.

The last picture shows the engine installed on the motor mount.

Attachments
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize


< Message edited by sahartman21 -- 5/26/2012 2:27 AM >


Hide Signatures

(in reply to sahartman21)
       Post #: 20

RE: AJ-2 Construction Revisited - 5/22/2012 4:19 AM   
sahartman21


 

Posts: 1341
Score: 110
Joined: 11/3/2007
Last Login: 5/22/2013
From: Fritch, TX, USA
Status: offline
I installed the firewall and engine in the second AJ-2 tonight.

The second time was much easier and quicker.

Attachments
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize


Hide Signatures

(in reply to sahartman21)
       Post #: 21

RE: AJ-2 Construction Revisited - 5/25/2012 4:24 PM   
club 20 king



Posts: 37
Score: 100
Joined: 11/7/2002
Last Login: 4/23/2013
From: Hinckley, UNITED KINGDOM
Status: offline
Loving this build, keep it coming.

Thank You
J

Hide Signatures

(in reply to sahartman21)
       Post #: 22

RE: AJ-2 Construction Revisited - 5/25/2012 5:13 PM   
sahartman21


 

Posts: 1341
Score: 110
Joined: 11/3/2007
Last Login: 5/22/2013
From: Fritch, TX, USA
Status: offline
It's good to see some interest!

In the USA most buy composite models.

I've found that if you are a good Q500 builder you can build a QM40.

I will continue this weekend.

Hide Signatures

(in reply to club 20 king)
       Post #: 23

RE: AJ-2 Construction Revisited - 5/26/2012 2:32 AM   
sahartman21


 

Posts: 1341
Score: 110
Joined: 11/3/2007
Last Login: 5/22/2013
From: Fritch, TX, USA
Status: offline
A 1/4" thick piece of plywood is being installed in the following pictures.

Note: I am mounting the gear further back than shown on the drawings. This is to reduce bouncing on landing.

Attachments
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize


< Message edited by sahartman21 -- 5/26/2012 3:26 PM >


Hide Signatures

(in reply to sahartman21)
       Post #: 24

RE: AJ-2 Construction Revisited - 5/26/2012 10:04 PM   
sahartman21


 

Posts: 1341
Score: 110
Joined: 11/3/2007
Last Login: 5/22/2013
From: Fritch, TX, USA
Status: offline
The following pictures shows the installation of 3/4" diameter dowel and 1/8" thick plywood on the wing:

Attachments
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize
Click to see fullsize image.
Click for fullsize


< Message edited by sahartman21 -- 5/27/2012 12:44 AM >


Hide Signatures

(in reply to sahartman21)
       Post #: 25

Page:   [1] 2 3 4 5   next >   >>  
All Forums >> RC Airplanes >> Pylon Universe - RC Pylon Racing >> Q-40 Racing >> AJ-2 Construction Revisited
Page: [1] 2 3 4 5   next >   >>  





Jump to:


 
Google 



Search | Marketplace | Event Calendar | Local Clubs | Magazine | Product Ratings | New Products | Discussion Forums

Photo Gallery | Instructor Search | Field|Track|Marina Search

Advertisers | Hobby Vendor Resources | Rate Manufacturers | Sign In/Sign Up

SITE MAP!   : :   FORUM RULES

RC Universe is a service of Internet Brands, Inc. Copyright © 2001-2013.

Charities we support that also need your help
Yorkie Rescue | Humane Society | ASPCA | Crohn's-Colitis America


0.375RCU1