RE: Extreme Flight Vanquish 2m Build Thread
OK, so here is today's progress. I was able to get the motor mounted up. I installed the speed control on the bottom half of the motor box area. Having the chin cowl removable makes this really easy. The spacers provided for the motor worked great, although I did have to modify a couple of the holes to make them line up with the ones on the motor, but not a big deal. I also got the wings and stabs hinged, and also installed the control horns. Someone on the other thread had requested a picture of the spacing between the spinner and front.
Arch