RE: Another Fliteskin ME 109 build thread
The next step was to glue to the front of all the ribs the 1/4" square sub-leading edge. Once done, it allow the gluing of W6B which is where the slat edge will slide on. At that stage I have also prepared the slats operating rod sleeve and glued it to sub-rib W9B and W7B (for both half wings while I am at it), and glued the sub-ribs in place.