Last bit of progress for the night.
Wing tube socket installation is 99% complete. I still have 2 pairs of sheer webs to put between the tube sockets and the lower wing sheeting And the wing tube bolt hardpoints. Otherwise, all that is left to do to the wings is the drag rudder linkages and outer flap servo mounts. These tasks will be the secondary goals to complete tomorrow.
The new Bat tail was laid up as well. The primary goal tomorrow is to get the bat tail halves joined and start and complete the repairs to the center section. The majority of these repairs involve the gear doors. Luckily, templates are all made up, so it will be fairly quick and easy to replace the damage parts.