I cut out the elevon hinge extension tubes:
Then applied some glazing putty to blend in the mew bat tail to the center section:
Then the bottom of the sings were sheeted:
Then they were removed from the sheetig jigs.
The right wing panel then had the sheeting sanded flush with the root and tip ribs. Then the 1/4" leading edge stock was installed and rough shaped. The wingtip was then installed and sanded to shape. And then the trailing edge was cut and sanded to the correct shape. Hatch locations for the servos were drawn on place as well. This wing is ready to have its leading edge shaped, elevons and flaps cut off and capped and the elevon hinge extensions installed. Hopefully this will all get done tomorrow as well as glassing the bottom surfaces.
The left wing panel is ready for everything that has been done to the right wing to be accomplished.