RCU Forums - View Single Post - Carf - Models J-10 build thread
View Single Post
Old 10-30-2014, 10:09 PM
  #41  
Airforce7
My Feedback: (31)
 
Airforce7's Avatar
 
Join Date: Feb 2004
Location: Brentwood, CA
Posts: 1,123
Received 18 Likes on 17 Posts
Default

OK I checked my kit for the rods and this is what I found.

List of Rods:
2X ~39.5" Long
2X ~15.75" Long
1X ~12" Long (metal)

List of Packs:
Fin
Wing
Canard
Engine Mount
Fuselage
Landing Gear
Hatch
Canopy (empty bag, hardware installed already)
Thrust Vector Tube
Nose Gear Pack

See pictures attached.

Looks like the two long and two short need to be connected together and the metal rod is used as a sleeve like Bob mentioned. The thrust vector tube pack has six threaded rods in it, which I believe are used to connect all the rods together to make the two push rods from the servos to thrust tube.
Attached Thumbnails Click image for larger version

Name:	Pack1.jpg
Views:	350
Size:	109.8 KB
ID:	2043578   Click image for larger version

Name:	Pack2.jpg
Views:	316
Size:	108.2 KB
ID:	2043579