Finally got around to starting my Revolver. I was pleased to find the LG area has been fortified.
The plywood plate is keyed into the firewall and a bulk head at the rear. 45 deg. bracing on
all 4 sides along with dowel pining. This should keep the gear from breaking loose on
normal to hard landings. I'll give a report after its in service .