Originally Posted by
Justflying1
Hi,
l am installing two 6kg size turbines in an A10. I'm using 6 mm lines from breathers rite through the pump inlets. Both turbines will be independent. One tank one turbine etc. will I be OK to run 4 mm from pump outlet to turbine considering my pump will be close to the front of aircraft and engines obviously at the back or should I run it back up to 6 mm all the way to the turbine before reducing it to 4 mm.
i realise this question has probably been asked before but I am not sure on the best way to go about this.
I also was wondering what everyone has been using to remove glue from fuselage. This is just glue that is left behind from tape and it's not epoxy. In the past I have used a little methylated spirits diluted with water but wonder if anyone has any great ideas they would like to share.
4mm will be fine for 60 turbines