While waiting for my Blue-Bird Servos to arrive i installed the lansing gear.
LG installation was a real breeze:
1. loctited all the LG bolts.
2. Marked and drilled 2mm holes in the plywood mounts.
3. tapped holes to 3mm thread.
4. wicked thin CA into the threads for stiffening.
DONE!
Main Landing Gear Test video:
And now she is on her own feet