RCU Forums - View Single Post - 8th Scale Aviation's, "CzechMate" Short-kit, Group build
Thread
:
8th Scale Aviation's, "CzechMate" Short-kit, Group build
View Single Post
12-01-2019, 07:37 PM
#
283
Iron Dog
Join Date: Feb 2009
Location: Sacramento, CA
Posts: 1,348
Likes: 0
Received 3 Likes on
3 Posts
It has been awhile, but we are back at the build, again!
I am going to take you back to post #234. We had already installed the tailwheel assembly, and ran stringers from the last fuse former to then back of the fuse. Now, we are going to fare it all in, in preparation for sheeting the bottom of the fuselage. Scrap pieces are glued in-place, as pictured. Note that the blocks match the width of the side stringers, to allow for the thickness of the sheeting/strip planking.
Tim's rear fairing block.
Here the author (Ollie) carefully checks fit and alignment of the block, prior to gluing.
Another angle
Two lengths of scrap stringer material installed; and, started sanding to "round" the bottom.
Sanding roughly completed.
Reply
Like
Iron Dog
View Public Profile
Send a private message to Iron Dog
Visit Iron Dog's homepage!
Find More Posts by Iron Dog
View iTrader Profile