Originally Posted by
avi sirota
Moving on to the fuel system. the kit arrives with 4 fuel tanks. 2 mains saddle type tanks to be located in center section both side of turbine bay, 1 front main to be placed in the bottom front fuselage and one more to be used as liquid for the smoke system.
All necessary clunks and fuel lines are supplied with the kit. I used the supplied Viton fuel lines inside the tanks and used Tygon lines for the entire system.
at this time i skipped installing a smoke system therefore not used the 4th tank.
This is before applying safety wire to all lines.
With the clunk line that long how is it going to get to the top of the tank? It needs to be shortened to the straight length minus 5mm
Though personally I would alway use a hi flow felt clunk in tanks like that.
Dave