Just installed the choke servo. Getting closer to the completion. (not the detailed stuff, just to be flight ready) I also have all the gear working, as well as the sequencer programed so that I can get the doors open 1st and then the retracts come in (up) then the doors close. I did install the Jet tronics valves. Very cool.
I installed 3 air tanks, and so far, with the tanks pressurized to 50 lbs, I can get 6 cycles.