The 125-A is mounted on the mounts and F-1 drilled for them, I'll drill F-2 and F-3 through F-1. I don't have any M4 x 35 mm bolts to bolt it to the firewall, I will hit Micro Fasteners up for them in a couple of minutes. I'm still having fun with it.
Da pitcher loader ain't werkin ryte now.
This 150 sure needs a cylinder.