RCU Forums - View Single Post - aeroworks edge 540 pictured construction manual
Old 03-25-2004, 05:40 PM
  #33  
SunDevilPilot
 
SunDevilPilot's Avatar
 
Join Date: May 2002
Location: Gilbert, AZ
Posts: 2,025
Likes: 0
Received 3 Likes on 3 Posts
Default RE: aeroworks edge 540 pictured construction manual

OK, Where I am now...

I am currently working on the elevators. I have installed the TE on them and am currently sanding it down smooth. After I get that done I will be installing the hinges. Once the hinges are done I will bevel the surfaces. By Beveling last you can easily align and drill straight holes for the hinges (Robart Hinge Points).

Phil (Mesa, AZ)
Attached Thumbnails Click image for larger version

Name:	Ay74412.jpg
Views:	38
Size:	38.9 KB
ID:	115446