RE: Mid Star 40 Build Thread
I got some more work done on the right wing tonight. The 3/16 shear webs were added to the wing. The integrity of the wing is dependent on the installation of the shear webs so I am careful to ensure good glue joints. After the shear webs had dried, I added the top main spar making sure it was fully seated in the wing ribs. I then added the 3/16 square top turbulator spar and the leading edge material, which is a 5/16 square stick that will need to be shaped later on.