RCU Forums - View Single Post - Construction Pics of a Carden 35% Edge 540
Old 03-03-2003, 02:33 AM
  #54  
Ron Eisner
Senior Member
My Feedback: (4)
 
Join Date: Dec 2001
Location: Pickerington, OH
Posts: 112
Likes: 0
Received 0 Likes on 0 Posts
Default Modified Cowl Ring

This is the final shape of the cowl ring before installation. Blind nuts are for hold down bolts, 2 required each side for 2 pc cowl. Ring is 3/16" ply, top holes are for hatch pins, bottom holes for lower hold down bolts.
Very EZ to do, just trace the outline of F-1 and the hatch. Continue to trim slightly for a perfect flush fit.
Cowl is joined to ring with 30 minute epoxy after scuffing and removing the mold release. Later, a light slurry of epoxy and cut fiber will be added for strength.
Ron
Attached Thumbnails Click image for larger version

Name:	59804_660.jpg
Views:	102
Size:	58.7 KB
ID:	32250