RE: the hyper st PRO thread!
if you mean the front, its 9 screws total, 6 i the front and two below (front two) then the bottom screw of one of the shocks so the cvd's slide out. takes about 5 minutes by hand. if you mean the center its 4 screws, the top ones. then the 2 brake assemblies slide up and out with the disks. just pull out diff after that. tada.