RCU Forums - View Single Post - PAU 36% Edge 540 Assembly
View Single Post
Old 01-13-2008, 10:52 PM
  #21  
Ken-h
My Feedback: (3)
 
Ken-h's Avatar
 
Join Date: Oct 2004
Location: Whitefish, MT
Posts: 668
Received 7 Likes on 3 Posts
Default RE: PAU 36% Edge 540 Assembly

Now it's time to add more sweetness, the DA-100. As mentioned before, the firewall is pre-marked so you'll just need to center your motor in the "+". Take a ruler and draw a line across the entire firewall for the thrust line and offset center line.

I drew out the template and taped it on the firewall as shown and drilled the holes for the 1/4-20's. We'll be providing a template for the DA-100. You will need 1-1/4" standoffs for the 100, and four 1/4-20 x 2-1/2" long. Now that I have the motor mounted, I'll mark the locations for the fuel line and throttle push rod remove motor and drill those locations and reinstall motor.
Attached Thumbnails Click image for larger version

Name:	Zx70509.jpg
Views:	21
Size:	43.0 KB
ID:	850714   Click image for larger version

Name:	Xt60295.jpg
Views:	19
Size:	52.5 KB
ID:	850715   Click image for larger version

Name:	Di10997.jpg
Views:	18
Size:	40.3 KB
ID:	850716   Click image for larger version

Name:	Ib82400.jpg
Views:	26
Size:	33.5 KB
ID:	850717   Click image for larger version

Name:	Qc39034.jpg
Views:	23
Size:	35.1 KB
ID:	850718