RCU Forums - View Single Post - PAU 36% Edge 540 Assembly
View Single Post
Old 01-23-2008, 10:27 PM
  #40  
Ken-h
My Feedback: (3)
 
Ken-h's Avatar
 
Join Date: Oct 2004
Location: Whitefish, MT
Posts: 668
Received 7 Likes on 3 Posts
Default RE: PAU 36% Edge 540 Assembly

I’ve had wood rings made from the wood that was provided as box insulation for the shippers. You will want the spinner back plate at least 7-3/4” from the firewall or a 1-7/8” base mount for the motor. I’ve been trying hard to have these made locally at the moment but the costs are pretty high here. I am hoping to hear something in the next few days but I would not count on it. If you have a scroll and some time, this is the way to go and you’ll make DA very happy.

I stacked these up until I achieved the correct distance and mounted the motor. The bolt used were ¼-20 3-1/4” long with lock or compression nuts and fender washers. Now I’ll remove the motor and mark the area on the firewall to cut out. CA all the rings together and drill two holes in the mount for the mixture screws. Now I can remount the motor and install the throttle servo and push rod as I did on the 100.

Ken
Attached Thumbnails Click image for larger version

Name:	Ge96735.jpg
Views:	24
Size:	59.1 KB
ID:	859402   Click image for larger version

Name:	Yu63559.jpg
Views:	35
Size:	60.2 KB
ID:	859403   Click image for larger version

Name:	Di98654.jpg
Views:	23
Size:	67.6 KB
ID:	859404   Click image for larger version

Name:	Oi14071.jpg
Views:	24
Size:	76.4 KB
ID:	859405   Click image for larger version

Name:	Rc40944.jpg
Views:	19
Size:	40.8 KB
ID:	859406   Click image for larger version

Name:	Yo91741.jpg
Views:	20
Size:	53.2 KB
ID:	859407   Click image for larger version

Name:	Ik89858.jpg
Views:	17
Size:	48.9 KB
ID:	859408