RE: 1/2a Rivets Build!
Well heres progress report number two.
The wing is basically done. It was a frustrating job I must admit, but I got it handled. The dowel LE sure feels tough! I wouldnt wanna mess with that guy. There was no centre rib in the Laser cut parts so I had to make one. am I missing something or is this correct?
Vertical stab Is mounted and the Horizontal stab is covered.
To do list is, cut out and build ailerons and linkage. mount elevator controls, servos, plank bottom of fuse and cover. I will probably get most of that done tomorrow. Maybe If I dont sleep in I can finish it!
Still waiting for a pic of that elevator control vicman.
Other then that its allllll good!!