RE: RC Modeler Magazine
RCM and MAN only paid about 5 bills for a constructionarticle. An articlegenerally took from 6 months to a year to write. Most of the regularscratch builders got fed up and stopped contributing to the mags. Then the mags stopped being about building. They were too cheap to pay foran articleand it came back and bit them on the behind. And that is the rest of the story.