Construction of 100cc Extra 300 look pics!!!!!!!!!!!!!!.
#2
Member
Thread Starter
Join Date: Feb 2006
Location: NagpurMaharashtra,, INDIA
Posts: 51
Likes: 0
Received 0 Likes
on
0 Posts
RE: Construction of 100cc Extra 300 .
Hi Everybody,
Lets start with fin construction. Before doing anything look wheather the fin is damaged from any side if so repair that damage. Then cut out fin & rudder using smooth balsa saw. Glue leading edge & trailing edge & leave it for few minutes. Let the glue set . After setting the glue sand leading edge & trailing edge to give proper shape. Use filler to fill dents if any. Do same with tailplane also. Look photos.
Lets start with fin construction. Before doing anything look wheather the fin is damaged from any side if so repair that damage. Then cut out fin & rudder using smooth balsa saw. Glue leading edge & trailing edge & leave it for few minutes. Let the glue set . After setting the glue sand leading edge & trailing edge to give proper shape. Use filler to fill dents if any. Do same with tailplane also. Look photos.
#3
Member
Thread Starter
Join Date: Feb 2006
Location: NagpurMaharashtra,, INDIA
Posts: 51
Likes: 0
Received 0 Likes
on
0 Posts
RE: Construction of 100cc Extra 300 .
Lets start to construct wings. Cut out ailerons from wings. Glue Leading edge & trailing edge to wings & leading edge to ailerons. After glueing all sand it to give proper shape.Look photos.
#4
Member
Thread Starter
Join Date: Feb 2006
Location: NagpurMaharashtra,, INDIA
Posts: 51
Likes: 0
Received 0 Likes
on
0 Posts
RE: Construction of 100cc Extra 300 .
Today i have completed fin, tailplane & elevator ( fully finshed) after sanding. Glued Wing tubes into wings & tailplane using epoxy. After setting epoxy, glue end ribs to wing & tailplane. After setting glue sand to give proper shape. After this start fuselage construction. Assemble side walls, then fit all formers laying one side wall on ground, place another sidewall on it. Don't glue anything before checking from every angles. Then use/apply glue/cyno to it. Then Glue main wing tube & tailplane tube to fuselage. sand it properly.
#5
Member
Thread Starter
Join Date: Feb 2006
Location: NagpurMaharashtra,, INDIA
Posts: 51
Likes: 0
Received 0 Likes
on
0 Posts
RE: Construction of 100cc Extra 300 .
Hi Everybody,
What i have completed today is full wing finshed after sanding & glueing them loction pins (dowels) to fixed in fuselage. Same thing done with tail plane also. Then start for hinging holes in fin-rudder, tailplane-elevator & in wing-ailerons.
Manish Borikar,
model mfg.,
Nagpur.
[email protected]
[email protected]
+91-0712-2241307.
What i have completed today is full wing finshed after sanding & glueing them loction pins (dowels) to fixed in fuselage. Same thing done with tail plane also. Then start for hinging holes in fin-rudder, tailplane-elevator & in wing-ailerons.
Manish Borikar,
model mfg.,
Nagpur.
[email protected]
[email protected]
+91-0712-2241307.
#7
Member
Thread Starter
Join Date: Feb 2006
Location: NagpurMaharashtra,, INDIA
Posts: 51
Likes: 0
Received 0 Likes
on
0 Posts
RE: Construction of 100cc Extra 300 .
Today what i have done is prepared canopy completly fiberglass undercarriage tail wheel mounts & firewall. Assembled full model for checks from each & every angle.
#8
Member
Thread Starter
Join Date: Feb 2006
Location: NagpurMaharashtra,, INDIA
Posts: 51
Likes: 0
Received 0 Likes
on
0 Posts
RE: Construction of 100cc Extra 300 .
Today i installed all the hardwares & radio equipments. Check for everything is going on properly or not. I am getting enough throws in elevator- 70degree, Ailerons-60 degree & in rudder 70 degree. I installed 1-1 servo each in wings for ailerons, has two servos one from each side for elevator, & one servo for rudder with pull pull system ( only in rudder). After checking all removed all servos & hardwares from model. Clean it & look for dents & marks to fill up using filler/putty. Fill up all the marks/dents sand & again clean ( make dust free) model for monokoting. Monokoting is going on. I will sent photos soon.
Manish
Manish
#10
Member
Thread Starter
Join Date: Feb 2006
Location: NagpurMaharashtra,, INDIA
Posts: 51
Likes: 0
Received 0 Likes
on
0 Posts
RE: Construction of 100cc Extra 300 .
Hi Everybody,
Here is the monokoted model full scheme is not done. It will require 2 days to complete.
Manish.
Here is the monokoted model full scheme is not done. It will require 2 days to complete.
Manish.
#12
Member
Thread Starter
Join Date: Feb 2006
Location: NagpurMaharashtra,, INDIA
Posts: 51
Likes: 0
Received 0 Likes
on
0 Posts
RE: Construction of 100cc Extra 300 .
Once we got the kit it desire for every one to build it fast as you can & move for flying. Till this we never sleeps properly.
Look the colour scheme done on wings.
Look the colour scheme done on wings.
#14
Senior Member
Join Date: Apr 2003
Location: Phenix City,
AL
Posts: 370
Likes: 0
Received 0 Likes
on
0 Posts
RE: Construction of 100cc Extra 300 look pics!!!!!!!!!!!!!!.
It's possible to build a plane of that simplicity in a short time. I built my Extra 300S .60 in two whole weeks. From bare balsa stick to fully built frame ready to cover.
#15
Member
Thread Starter
Join Date: Feb 2006
Location: NagpurMaharashtra,, INDIA
Posts: 51
Likes: 0
Received 0 Likes
on
0 Posts
RE: Construction of 100cc Extra 300 look pics!!!!!!!!!!!!!!.
Hi Everybody,
I just completed my monokoting work. Can't wait for taking photo & put it in.
Manish.
I just completed my monokoting work. Can't wait for taking photo & put it in.
Manish.