Q500 Radio, Engine, and Gear Installation
#1
Thread Starter
Join Date: Nov 2007
Location: Fritch,
TX
Posts: 2,060
Likes: 0
Received 0 Likes
on
0 Posts
Q500 Radio, Engine, and Gear Installation
This thread covers the common steps in getting the Q500 racer ready to fly.
A servo and pushrods are being installed in this series of pictures:
A servo and pushrods are being installed in this series of pictures:
#2
Thread Starter
Join Date: Nov 2007
Location: Fritch,
TX
Posts: 2,060
Likes: 0
Received 0 Likes
on
0 Posts
Q500 Radio, Engine, and Gear Installation
The following pictures show the installation of the servos in the fuselage.
I've had good luck using socket head screws for servo installations. They are much easier to tighten in confined areas.
I've had good luck using socket head screws for servo installations. They are much easier to tighten in confined areas.
#3
Thread Starter
Join Date: Nov 2007
Location: Fritch,
TX
Posts: 2,060
Likes: 0
Received 0 Likes
on
0 Posts
Q500 Radio, Engine, and Gear Installation
The landing gear was installed next.
10-24 nylon screws hold the gear in place and should shear off in a rough landing.
10-24 nylon screws hold the gear in place and should shear off in a rough landing.
#8
Thread Starter
Join Date: Nov 2007
Location: Fritch,
TX
Posts: 2,060
Likes: 0
Received 0 Likes
on
0 Posts
Q500 Radio, Engine, and Gear Installation
It is generally a good idea to pot the fuselage to fit the wing. This gives parts a perfect fit and will greatly reduce wear on the wing surface.
A mix of micro-balloons and finishing epoxy was used to make the seal.
A mix of micro-balloons and finishing epoxy was used to make the seal.
#10
Thread Starter
Join Date: Nov 2007
Location: Fritch,
TX
Posts: 2,060
Likes: 0
Received 0 Likes
on
0 Posts
Q500 Radio, Engine, and Gear Installation
I recycled an old set of pushrods. These were made from carbon fiber tubes, 2-56 rod, and ball links.
Short pieces of 2-56 rod were cut to fit. A z-bend was made on each piece of rod. These were test fit and later glued (with rubberized CA) to the proper length.
Short pieces of 2-56 rod were cut to fit. A z-bend was made on each piece of rod. These were test fit and later glued (with rubberized CA) to the proper length.
#12
Thread Starter
Join Date: Nov 2007
Location: Fritch,
TX
Posts: 2,060
Likes: 0
Received 0 Likes
on
0 Posts
Q500 Radio, Engine, and Gear Installation
Below are pictures of the finished model. It balanced at 2 7/8" back from the leading edge without any nose weight. It came in at 61.45 ounces, which is 1.45 ounces above the minimum weight.