RCU Forums - View Single Post - 1/6 F-105 Build Thread
View Single Post
Old 09-12-2018, 05:45 PM
  #40  
Viper1GJ
My Feedback: (20)
 
Viper1GJ's Avatar
 
Join Date: Oct 2003
Location: Saint George , SC
Posts: 2,423
Received 330 Likes on 217 Posts
Default

Finally got back to shop today after finishing all the hurricane Florence prep around the house and got the nose gear mounting templates cut out of wood for a dry fit. I will not glue them in until I get the nose gear door hinges and can determine the size of the relief cut outs for the hinges. The dry fit will allow temporary install of the nose gear for checking the toe in angle of the main gear which is where all the work so far is going.



Rough cuts of nose gear mounts


First dry fit.

Formers had to be sanded some to get correct fit and bottom of vertical rails hand to be rounded to fit bottom of fuse


Nose gear dry fit.

Last edited by Viper1GJ; 09-12-2018 at 05:47 PM.