RE: G&L Hobbies 1/5 Super Chipmunk Build (short kit)
<div style="margin: 0in 0in 10pt"><span style="line-height: 115%; font-size: 10pt">I started the wing the other day with layout. Servo bays, landing gear blocks, spar, hinges, and control horns. I also glued the stabilizer halves together along with the wing husks. I want to sheath the stabilizer hole. I will start cutting this week. I will sheet the top of the wing first, then install the LG blocks, trench for servo cables then sheath the bottom. Still waiting on wood so I have all week to get ready. Here are a few pic so fare.</span></div><span style="line-height: 115%; font-size: 10pt">TB
</span>