RE: FK SBA 60 Speeda - Build
My “to do” list.
1. Paint wheel wells black
2. Grind flats on gear struts
3. Check nose gear steering
4. Install main gear and connect air lines
5. Test gear operation
6. Install aileron linkage/push rods
7. Check final balance
8. Epoxy rudder hinges
9. Re-check radio programming, throws, expo, aileron differential, etc.
To be continued…