So when you say laminated between the strips, are you meaning that if the spar is to be a 1/4 sq. you will laminate 2 1/8 x 1/4 with the C.F. in between them?
I was and have just layed the C.F strips on the top & btm of the 1/4 sq. spars and CA'd them that way. I was just up Toledo yesterday but did not think of picking some of that C.F up [:@] but I did pick up some Zpoxy resin
I'll do some surfin' and look for some, I have to place an order for some balsa so hopefully I can just add it to the order.
Lom