RE: .60 size Pattern Tiporare Build
Well, the wings are joined and the center section will be glassed tomorrow. I have included a picture of where I am.
The leading radii is completed and the hinges are positioned in the trailing edge of the wing. The ailerons are now chamfered but the hinge holes are yet to be put in.
I will use the laminating epoxy for the fiberglassing of the center section and then I will built the front of the lower center section to match the lower part of the fuselage where the nose gear is. I will get the dowel in place for the front of the wing as well as the hold down screws. Not too sure I can get all of this done by tomorrow but that is the goal.
Jim