Things progressed nicely tonight, I didn't have to go look at Xmas lights.
Was going back and forth to the TV to watch my Steelers play. I got the vertical fin and rudder cut out as well as firewall & LG blocks. Holes were drilled in firewall and blind nuts installed as well as LG mount holes for sewing the gear in place. The alignment was time consuming, but will pay off in the long run. Here is the fuse using the magnet jigs and a shot of it assembled. Hopefully tomorrow night I will get the wing halves joined and start sheeting on the fuse top and bottom.
John